Project Overview

HAMS Engineering was mobilised on an emergency basis to repair a leaking DN150 pump room pressure pipeline at the Sri Lanka Institute of Nanotechnology (SLINTEC) facility in Colombo.

The 160mm uPVC PNt11 pressure line had developed a leak at the DN150 valve flange connection, threatening continuous operations at the research facility.

Our team was dispatched within hours of the initial call. The damaged flange connection was dismantled, new flange components were fitted with corrected alignment, and all connections were torqued to specification.

A full pressure and leak test confirmed zero leakage, and the pipeline was returned to full service on the same day.


Project Highlights

Emergency Response

Rapid mobilisation within hours of initial call

Completed Within One Day

Full repair and recommissioning in a single working day

DN150 Pressure Pipeline

DN150 valve connection repair and rectification

160mm uPVC PNt11

Pressure pipeline component replacement

Flange Replacement

Damaged flange connection fully replaced

Leak Rectification

Zero-leakage result confirmed by pressure testing

Pipeline Alignment

Corrected misalignment across pump room manifold

Testing & Recommissioning

Full pressure test and system recommissioning


Scope of Work

Emergency site inspection and pipeline assessment
Dismantling of damaged DN150 valve flange connection
Replacement of flange components on 160mm uPVC PNt11 pressure pipeline
Pipeline alignment correction and adjustment
Pressure and leak testing of recommissioned pipeline
System recommissioning and handover

Featured Image

Existing Pipeline Condition — DN150 valve connection showing leak damage

Existing Pipeline Condition — DN150 valve connection showing leak damage

Project Gallery

Click any image to enlarge


Client Outcome

Project Results

Pipeline leak fully rectified within one working day
Minimal operational disruption to SLINTEC facility
Zero-leakage result confirmed by pressure testing
Pump room returned to full service same day
All works completed to industry standards

Project Information

IndustryEmergency Repairs
LocationColombo, Sri Lanka
ClientSri Lanka Institute of Nanotechnology (SLINTEC)
Year2026
Completed2026
Status
Completed
Services
Plumbing Systems
Mechanical Engineering
Emergency Repairs
MEP Maintenance

Need a Similar Project?

Talk to our engineering team about your requirements. We'll provide expert advice and a detailed quotation.

1